WHEN: During the period 9/05/2023 thru 10/20/2023, the Hubbs Hall loading dock will be blocked from 4AM to 10AM. As shown on the infographic, part of the 2nd floor balcony will be permanently blocked between the dates noted.
WHY: To repair the existing slab on grade and failed plumbing systems within the building.
HOW: Hubbs Hall loading dock and the identified Hubbs Hall 2nd floor balcony will be inaccessible 4AM – 10AM during the dates indicated. All other access to building will not be disrupted.
WHAT SHOULD YOU DO: Avoid the area and schedule deliveries to the Hubbs Hall loading dock after 10AM for the dates noted.
If you have any questions, please contact the FM Customer Relations Help Desk at (858) 534-2930 or Project Manager William Pavlick at (858) 265-4961
We greatly appreciate your patience during these construction activities.