UCSD CAMPUS NOTICE University of California, San Diego |
|||||
FACILITIES DESIGN & CONSTRUCTION August 25, 2008
ALL STUDENTS AT UCSD
Justice Lane Project Location/Impact The North Campus Switch Station Expansion Project is under construction. As part of this project the contractor will be installing underground electric conduits on Hopkins Drive, Voigt Drive West and Justice Lane between the dates of June 16 and September 12, 2008. The new utility lines are needed to upgrade the capacity of Campus 12KV Distribution System in order to provide power to future upcoming projects. Immediate Street Impacts Between the hours of 7:00 AM and 3:30 PM traffic on Hopkins Drive, Voigt Drive and Justice Lane may be reduced to one lane during construction. Emergency vehicle access will be available and flagmen will be directing traffic as needed. East and West sidewalks, north of the intersection of Voigt Drive and Hopkins Drive up to the driveway south of the RIMAC Building will be closed during the construction period. Detour signs for vehicles and pedestrian traffic will also be posted. Please view the area map at: http://www.fdc.ucsd.edu/alerts/files/12kv061808.pdf If you have any questions please contact the Project Manager Subhash Nangia at (858) 534-1169, or Project Specialist Laurel Foster at (858) 822-3704). We greatly appreciate your patience during these construction activities.
|