CAPITAL PROGRAM MANAGEMENT December 23, 2019
Project Location/Description: Additional Concrete Finish work for the Mid-Coast Light Rail Transit Project will occur January 5 through 10, between the hours of 9:00pm and 5:00am each night. The extended schedule will allow crews to resume work on the overhead track and vertical columns located at the Voigt Drive and Campus Point Drive intersection. Immediate Parking Lot, Street Traffic, and Pedestrian Impacts: During construction hours, Voigt Drive will close between Campus Point Drive and the P703 Parking lot entrance. Vehicles, bicycles, and pedestrians will be detoured around the construction area using Campus Point Drive, Medical Center Drive, and Health Sciences Drive. In addition to the full closures on Voigt Drive, there will be partial lane impacts on Campus Point Drive. However, Campus Point Drive will remain accessible at all times to vehicular, bicycle, and pedestrian traffic. In an effort to provide advanced notice to frequent travelers of the area, large electrical messaging boards will be placed near the intersection of Voigt Drive and Campus Point Drive in advance of the work, confirming the dates and times of the closures. The construction schedule was carefully sequenced during evening hours to minimize confusion and alleviate traffic congestion during peak travel times.
Please view the area map:
For more project information, please view SANDAG’s links:
For future Trolley information view: If you have any questions, please contact Project Manager Greg Coghill at gcoghill@ucsd.edu or 858-822-6849 or Project Specialist Grant Wong at gmw003@ucsd.edu or 858-534-2981. We greatly appreciate your patience during these construction activities.
|