Project Purpose
A geotechnical investigation of the 0.4-acre site proposed as the location for a new City of San Diego Fire Station.
Location and Duration
From September 21, 2021 – September 24, 2021, the contractor will be staging equipment off the road and sidewalk along North Point Lane (please see the Figures 1 & 2 linked below).
Immediate Parking Lot, Street Traffic and Pedestrian Impacts